Kallikratia, Chalkidiki, Northern Greece

Client: Municipality of Kallikratia

Period of services: December 2005 – today

Coast of Nea Heraklia:

  • Construction of three submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
  • Construction of a retaining concrete wall founded on concrete piles at the seaside of the existing damaged coastal wall, and beach nourishment with coarse material.
  • Construction of protective slope composed of quarry rocks.

Coast at “Aigeas” camping area:

  • Construction of two submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
  • Construction of protective slope composed of quarry rocks.
  • Extension of existing groynes.

Coast of Geoponika-Katerina:

  • Construction of protective slope composed of quarry rocks along the eroded side of the existing coastal road.
  • Beach nourishment eastward of the protective slope.

Coast at “Delfinia” area:

  • Construction of three submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
  • Construction of protective slope composed of quarry rocks.

Coast of Sozopoli:

  • Demolition of the existing old jetty and the existing small size goyne.
  • Construction of protective slope composed of quarry rocks.
  • Beach nourishment using the onsite concentrated sand.

Services provided:

  • Coastal Engineering Study using mathematical models
  • Environmental Impact Studies
  • Conceptual and preliminary design of coastal protection works

Budget of works: 6,810,000 €