Coast of Nea Heraklia:
- Construction of three submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
- Construction of a retaining concrete wall founded on concrete piles at the seaside of the existing damaged coastal wall, and beach nourishment with coarse material.
- Construction of protective slope composed of quarry rocks.
Coast at “Aigeas” camping area:
- Construction of two submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
- Construction of protective slope composed of quarry rocks.
- Extension of existing groynes.
Coast of Geoponika-Katerina:
- Construction of protective slope composed of quarry rocks along the eroded side of the existing coastal road.
- Beach nourishment eastward of the protective slope.
Coast at “Delfinia” area:
- Construction of three submerged breakwaters, and beach nourishment at the leeward side of the breakwaters.
- Construction of protective slope composed of quarry rocks.
Coast of Sozopoli:
- Demolition of the existing old jetty and the existing small size goyne.
- Construction of protective slope composed of quarry rocks.
- Beach nourishment using the onsite concentrated sand.
Services provided:
- Coastal Engineering Study using mathematical models
- Environmental Impact Studies
- Conceptual and preliminary design of coastal protection works
Budget of works: 6,810,000 €