Alexandroupolis, Greece

Client: EKO-ELDA SA

Period of services: 3/2001 till 5/2001

Period of construction: 2001 till 2003

Construction of 5 new fuel pipelines for fuel transfer from an offshore mooring point to the oil storage facilities (1500 m apart).

Construction of a tanker mooring for 10000 DWT vessels.

Services provided:

  • Detailed design of pipeline wave protection works, pipeline foundation and cathodic protection
  • Design of the vessel mooring system
  • Composition of Bill of quantities
  • Drafting of Construction Specifications