Aghios Efstratios Island, Greece
Client: Prefecture of Lesvos
Period of services: May 2005 – December 2009
Project concerns the upgrade of the existing port structures
- Windward breakwater (325m total length at -7,80m)
- Quay wall (105m total length at -7,80m)
- Land area of a total surface of 7,500 sq.m
- Fishing shelter breakwater built with concrete blocks (85m total length at -4,00m)
- Concrete floating pontoon (20m total length and 3m wide) to accommodate seaplane services
Services provided:
- Conceptual, preliminary and final design of marine works
- Coastal Engineering Study
- Environmental Impact Study
- Drafting of Tender Documents
Budget of works: 18,700,000 €