Palaio Faliro, Attica, Greece

Client: Lamda TechnOL Flisvos Marina S.A.

Flisvos Marina was designed incorporating most of the existing older marine works, while the land area was radically re-designed. The aim of the new design was the optimization of the protection of the harbour basin, the increase of berthing capacity and upgrading of services offered.

It is a 304 berths marina for megayachts from 20 up to 70m long that includes:

a) Marine works: jetties on concrete piles of 730m total length, 90m extension of the main breakwater and construction of a new lee breakwater of 450m total length.

b) 11,000sq.m. of land area.

Services provided:

  • Master plan of marine works
  • Wave disturbance study applying mathematical models
  • Detailed design of marine works
  • Environmental Impact Study
  • Preparation of tender documents for marine works
  • Supervision of construction of marine works

Budget of marine works: 39,700,000 €