Argostoli, Cefalonia Island, Greece

Client: Prefecture of Cefalonia & Ithaca

Period of services: January 2002 – April 2006

Evaluation of the technical, legal, administrative and operational characteristics of the port facilities owned by Fulgor S.A.. The services focused on:

Port facilities for cruise vessels berthing and small cruise terminal building:

  • Jetties on piles (reinforced concrete Ø1200 piles):

– Central berthing jetty, «Τ» shaped, 67m long and 14/29m wide

– Two breasting jetties, 16.80x14m each, at 30m distance from the central jetty.

  • Two steel gangways, connecting the jetties.
  • Access jetty on piles, 172m long and 8m wide.
  • Quaywalls of a total length of 124m.
  • E/M installations and networks.
  • Small terminal building (85 m2).

Services provided:

  • Port facilities master planing
  • Topographic-bathymetric surveys
  • Wave climate and coastal engineering studies
  • Preliminary and final design
  • Environmental Impact Study
  • Tender Documents

Budget of works: 7,050,000 €