South Evoikos Gulf
Client: ΕLTER S.A.
Period of services: December 2011 – August 2012
Period of construction: April 2012 – August 2012
- Installation of the 20” submarine steel pipeline of high pressure natural gas connecting Varnavas site (Attica region) to Aliveri site (Evoia island)
- Construction of the pipeline shore approach protection works
- Construction of the onshore return pulley retaining system
- Construction of the shore pull sheave anchoring and rigging for the secure anchoring of the pipeline laying vessel of SAIPEM Spa at landfall points
Services provided:
- Wave prediction study at landfall points
- Detailed pipeline foundation design
- Detailed design of pipeline protection works
- Detailed design of the onshore return pulley retaining system
- Detailed design of the pipeline laying vessel near shore anchoring blocks
Budget of works: 1,500,000 €