Larymna, Greece
Client: GENERAL MINING AND METALLURGICAL COMPANY “LARCO”
Duration of services offered: December 2005 – December 2007
Multipurpose port facilities (dry bulk cargo, containers):
- Extension of existing quay by 300m at –17.80m for cargo vessels up to 100,000 DWT (quaywall built with caissons 18.0×12.10×18.30m)
- Other quays (140m length at –8.50m and 120m length at –13.90m) for bulk cargo vessels (quaywall built with caissons 18.0×12.10×14.40m)
- 55,000 sq.m. storage area for bulk and general cargo
Services provided:
- Port master plan
- Wave climate study applying numerical models
- Conceptual design and preliminary environmental impact assessment
- Geotechnical survey
- Coastal engineering study
- Conceptual, preliminary and final design of marine works
- Environmental Impact Study
- Tender documents
- Technical Assistance to the client during the tender process (evaluation of contractors’ bids)
Budget of works: 35,000,000 €