Larymna, Greece

Client: GENERAL MINING AND METALLURGICAL COMPANY “LARCO”

Duration of services offered: December 2005 – December 2007

Multipurpose port facilities (dry bulk cargo, containers):

  • Extension of existing quay by 300m at –17.80m for cargo vessels up to 100,000 DWT (quaywall built with caissons 18.0×12.10×18.30m)
  • Other quays (140m length at –8.50m and 120m length at –13.90m) for bulk cargo vessels (quaywall built with caissons 18.0×12.10×14.40m)
  • 55,000 sq.m. storage area for bulk and general cargo

Services provided:

  • Port master plan
  • Wave climate study applying numerical models
  • Conceptual design and preliminary environmental impact assessment
  • Geotechnical survey
  • Coastal engineering study
  • Conceptual, preliminary and final design of marine works
  • Environmental Impact Study
  • Tender documents
  • Technical Assistance to the client during the tender process (evaluation of contractors’ bids)

Budget of works: 35,000,000 €