Aghios Efstratios Island, Greece

Client: Prefecture of Lesvos

Period of services: May 2005 – December 2009

Project concerns the upgrade of the existing port structures

  • Windward breakwater (325m total length at -7,80m)
  • Quay wall (105m total length at -7,80m)
  • Land area of a total surface of 7,500 sq.m
  • Fishing shelter breakwater built with concrete blocks (85m total length at -4,00m)
  • Concrete floating pontoon (20m total length and 3m wide) to accommodate seaplane services

Services provided:

  • Conceptual, preliminary and final design of marine works
  • Coastal Engineering Study
  • Environmental Impact Study
  • Drafting of Tender Documents

Budget of works: 18,700,000 €