Corfu Island, Ionian Sea, Greece
Client: Corfu Port Authority S.A.
A 80 berths yacht shelter for yachts of various sizes that includes:
a) Marine works: a windward breakwater of 190m total length and a leeward breakwater of 145m total length, piers of 300m total length, floating pontoons of 115m total length.
b) Land area works: construction of all necessary facilities for the operation of the shelter, including the renovation of existing buildings, parking spaces, green areas.
Services provided:
- Master Planning
- Licensing dossier
- Geotechnical Investigation and Study
- Detailed design of marine works
- Detailed design of electromechanical Installations
- Environmental Impact Study
- Cost-Benefit Analysis
- Tender Documents
Budget of works: 12,110,000 €